**Next approved action (D-081 (dispositions), D-080 (execution Astra; review Opus), D-079(f)):** Both D-072 bridges are parked. Fontana failed (c-625, HOLD). Egerton s133 is PROCESS_INVALID: a facing-page label leaks in P43 (replacement verifier REJECT; read preserved, not scored; L-376), and the identity route is infeasible as specified (D-084 b). D-079(f) pivot review: the reviewer proposes internal referents fixed by the manuscript itself, starting with an order-agnostic, powered zodiac label test and a power audit of the label-referent nulls (D-084 d). Astra decides execution. Win definition: D-081(e).